Contracts
Works realised so far have gained a high esteem by both the corporate direct investors and contractor’s companies. Our activity is characterised by an individualised approach to complex technical issues.
In 2011 the following was executed:
- Heat And Power Plant DALKIA POZNAŃ ZEC S.A. Execution of construction works for the investment Extension of biomass management for a BFB boiler of the Dalkia Poznań ZEC S.A. Heat and Power Plant
- EC WROCŁAW – modernisation of a turbine of block 3 with repair of the turbine foundation.
- Power Plant JAWORZNO II hacking off and making new heads of reinforced concrete posts at the height of 30m
- CARGILL (POLSKA) SP.zo.o. Extension of a Gluten Warehouse in Bielany Wrocławskie
- EC Dalkia Łódź Modernisation of a K3 boiler technological foundations, Transformer station Commercial and service building with office,
- Service and warehouse areas with a support infrastructure in Oświęcim – earth and reinforced concrete works.
In 2010 the following was executed:
- PKE Power Plant of Jaworzno. – Execution of reinforced concrete works for a task OFz-201 fluidized bed boiler with support facilities and a Control System for Biomass Application At the Power Plant of Jaworzno
- PULVERIT Polska Sp. z o.o. Tychy – Execution of an industrial floor of 3,200 m2
- Francisco Ros Casares Sp. z o.o. - Gliwice Technological foundation of a steel sheet customizing line with associated reinforced concrete channels,
- PKE Power Plant of Jaworzno III Modernisation of an unloading node,
- GRUPA OŻARÓW S.A. Ożarów Cement Plant in Karsy, Construction of an alternative fuels installation construction works
- SOKPOL SP. ZO.O. – Making reinforced concrete unloading gates
- Polish Railway Lines S.A. Branch Katowice Making reinforced concrete foundations in the PKP station in Katowice
- VITKOWICE MILMET S.A. – Making reinforced concrete channels for alteration of the existing production halls in Sosnowiec.
- KEDAR BUD Sp.zo.o. – Construction works for making a facility -Retirement House in Zebrzydowice
In 2009 the following was executed:
- SATURN MANAGEMENT Sp. z o.o. ŚWIECIE construction works for facilities of an BFB fluidized bed boiler
- FABRYKA PAPIERU (PAPER MILL) MYSZKÓW Sp. zo.o. – Reinforced concrete of the capacity of 216 M3
- Power Hydraulics Plant FMiU TAGOR S.A. in Zabrze Execution of an extension if trackbed of the existing gantry on a steelworks warehouse
- Zinc-Works POKÓJ SP. ZO.O. Ruda Śląska – Execution of construction works under a task ?Modernisation of a production hall Lining of a zinc charge storage site;
- Construction works for the task construction of Lidl in Katowice
- ENERSYS Sp.zo.o. Bielsko Biała Foundation works, assembly of a steel structure for facilities, making and assembly of a steel chimney
- MILIMEX Sp. z o.o. – Construction of a Culture Centre
- EC Czechnica in Siechnice – Modernisation of a K2 boiler Technological Foundations,
Realised in 2008:
- Myszków Paper Mill – Trafo Station, Foundation;
- Coking Plat in Radlin – Chemical coke battery of the rammed system (coke decanter, pumping station);
- Małogoszcz Cement Plant – Mill MC5 foundation, switchhouse, compressor room building, cooling water ducts, retention wall;
- Kielce Power-Heating Plant– cable ducts;
- DELTA SERVICE STANISŁAW ECHILCZUK in Zielonka – Civil works (reinforced concrete structures) for a steel-frame hall;
- Łagisza Power Plant in Będzin – modernisation of a railway car tippler for a block of 460 MW;
Realised in 2007:
- FABRYKA PAPIERU MYSZKÓW Sp. z o.o. (Myszków Paper Mill) – building-in of turbine set TP4;
- MECALUX Sp. z o.o. – construction of a technological foundation;
- FABRYKA PAPIERU MYSZKÓW Sp. z o.o. (Myszków Paper Mill) – technological line;
- ZAKŁADY KOKSOWNICZE w Zdzieszowicach (Coking Plant in Zdzieszowice) – coking battery No. 12 (hearth plate, jet slab, waste gas ducts);
- Mittal Steel Polad S.A. in Kraków - Fimi technological line,
- Mittal Steel Poland S.A. in Kraków - Guida technological line;
Realised in 2005/2006:
- Construction of production-warehouse hall for FICOMIRRORS Plant in Dąbrowa Górnicza – internal and external basins;
- KOKSOWNIA PRZYJAŹŃ (“Przyjaźń” Coking Plant) in Dąbrowa Górnicza – air drying station;
- Development of TMP FONDLMEC Production Plant in KSSE Żory – construction, civil works (reinforced concrete);
- P.P.H.U. "ELEKTROMETAL" in Zabrze – foundations for longitudinal plate cutting line with looping pit;
- SATURN MANAGMENT Sp. z o.o. in Świecie – turbine set foundation modernisation;
- EC 4 (Power-Heating Plant No.4) in Łódź - turbine foundation modernisation;
- UGINE & ALZ in Siemianowice - civil works (reinforced concrete);
- INSTAL KRAKÓW - Sławków water purification plant – walls, civil works (reinforced concrete);
- CARGILL POLSKA - Bielany Wrocławskie – development of the refinery building of coal regeneration building;
- CARGILL POLSKA - Bielany Wrocławskie – complete execution of trafo station building – civil scope;
- RENAULT – car service station with the regional vehicle inspection station in Zabrze - walls, civil works (reinforced concrete);
Realised in 2003/2004:
- ELEKTROCIEPŁOWNIE WYBRZEŻE S.A. EC Gdańsk (Power-Heating Plants in Gdańsk) – turbo-generator foundation modernisation;
- KOKSOWNIA PRZYJAŹŃ (“Przyjaźń” Coking Plant) in Dąbrowa Górnicza – modernisation of pressure absorption line “B”;
- EC2 (Power-Heating Plant No. 2) in BIELSKO BIAŁA – turbine set foundation modernisation;
- USINOR STAL SERWIS in Bytom – development of industrial halls;
- EC (Power-Heating Plant) IP KWIDZYŃ – modernisation of the turbine set 6UP25 foundation for the needs of turbine set 6UP37;
- ELEKTROCIEPŁOWNIA SIEKIERKI (“Siekierki” Power-Heating Plant) in Warsaw - modernisation of the turbine set 13p110 foundation, Block No. 7.